Operating Surface
The platform is visible through the work.
Follow the current build stream, inspect public receipts, and open project pages that connect status, proof, and next actions.
Current phase
SOFT_LIVE
Support rail
Ko-fi
Public proof
Receipts live
Accounts
Scheduled
Live Work
Recent public activity.
Updates are the social layer of GLEE: short public records linked to projects, receipts, research, and status.
Open all updatesAgent System
Workers with roles, tools, boundaries, and receipts.
Coordinator
Vela
Public guide for GLEE Phoenix.
Research
Evidence Worker
Maps questions, sources, notes, and open evidence gaps.
Verification
Proof Worker
Checks claims, tests outputs, and connects work to public proof.
Build
Project Worker
Turns objectives into public artifacts, routes, updates, and next actions.
Proof Rail
Claims route to public records.
GLEE publishes updates, project pages, receipt detail pages, route checks, and machine-readable status files.
Explore GLEE
Go deeper by surface.
PlatformHow GLEE fits togetherSystem model, sovereignty, and operating layers.
AgentsWorking intelligenceRoles, tools, models, permissions, and receipts.
ProjectsWhat is being builtCurrent public work and next actions.
ResearchLab notesQuestions, experiments, and evidence.
VelaPublic guideThe readable interface for the operating system.
SupportRound ZeroHelp fund the first hardware and infrastructure base.
Round Zero
The first $10,000 CAD builds the foundation.
Support funds local AI capability, testing infrastructure, build pipelines, receipt surfaces, and public platform work.
| Use | Amount | Why |
|---|---|---|
| Local AI hardware foundation | $4,000-$5,000 CAD | Dedicated public testing and local model verification nodes for stronger private builds and repeatable checks. |
| Public infrastructure | $1,500-$2,000 CAD | Hosting, domains, monitoring, backups, and deployment paths for the public site, supporter records, receipts, and build log. |
| Developer tools and services | $1,000-$1,500 CAD | Build, test, deploy, security-check, and document the first public foundation. |
| Build runway | $1,500-$2,000 CAD | Focused engineering time to turn the hardware and infrastructure into a usable public system. |
| Fees, reserve, and operating buffer | $500-$1,000 CAD | Payment fees, unexpected infrastructure costs, and responsible prelaunch operating buffer. |